Jodie’s New Concrete Driveway
Job Type
Driveway (Concrete)
Client/Job Name
Jodie
New Concrete Driveway Project Details
Detail | Description |
---|---|
Particular Detail | New concrete driveway |
Other Services Provided | Soil removal, drainage, concreting, crossover installation |
Client’s Needs | A new concrete driveway, possibly from scratch or replacing an existing one |
Client’s Challenges | New driveways are typically outsourced by the client or their builder |
Competitive Advantage | Expertise in design, consultation with other trades and consultants, ability to apply for necessary permits |
Typical Geo Locations | Outer suburbs or rural areas |
Equipment | Excavator and truck, sometimes a vibrating roller |
Labour | 1 x Offsider/Truck Driver |
Tools | Compaction plate |
Typical Duration | 1-4 days |
Client’s Needs
Jodie needed a new concrete driveway, either from scratch or as a replacement for an existing one. The project also required soil removal, drainage solutions, and the installation of a crossover.
Client’s Challenges
- New driveways are generally outsourced by the client or their builder, which can complicate coordination and scheduling.
Ballarat Excavators’ Competitive Advantage
Ballarat Excavators offer comprehensive support, from design assistance to consulting with other trades and applying for necessary permits. Their expertise ensures smooth project execution, even in outer suburbs or rural areas.
Project Execution
- Initial Consultation: Jodie explained her requirement for a new concrete driveway and the need for additional services like soil removal and drainage installation.
- Planning and Coordination: The team at Ballarat Excavators collaborated with other trades and consultants to finalize the project plan. They also handled all necessary permit applications.
- Execution:
- Day 1: Soil removal and initial site preparation using an excavator and truck.
- Day 2: Installation of drainage systems and further site preparation.
- Day 3: Pouring and finishing the new concrete driveway with the help of a vibrating roller and compaction plate.
- Day 4: Final touches and installation of the crossover.
- Completion: The project was completed within four days, providing Jodie with a durable and well-designed concrete driveway.
Related Services
- Concrete Driveway Installation
- Soil Removal
- Driveway Drainage Solutions
- Crossover Installation
Conclusion
Jodie’s driveway project demonstrates Ballarat Excavators’ ability to efficiently manage and execute complex projects. By providing a full range of services and expert coordination, they ensured Jodie’s new concrete driveway was completed on time and to her satisfaction.